The Mt. Dora Bible Science Center is a 16,000 s.f. renovation and addition to the school’s existing science building. Designed to be a state of the art teaching lab, this design-build project added 6,400 s.f. for science labs, a student center and classroom space. This challenging project site on a hillside includes remediation of groundwater intrusion, reinforcement of the existing structure and raising the roofline and ceiling heights by three feet. The project was fast-tracked from the beginning  of design through construction. The entire design, permitting and construction took 14 months.