Evergreen provided construction management  services to owner Central Florida Health Alliance for a new EP (Cath) Lab Replacement. This project included deconstructing the old lab and equipment , expanding into the ED overflow, rebuilding the HVAC, med gas and electrical systems, rotating layout by changing the control and equipment room locations, installing new Phillips equipment, reinforcing the existing structure for new overhead supports, replacing the concrete floor and replacement of the RTUs serving a large area of the ED, radiology and cath labs.